Odoo Manufacturing · set up by TechNext

Every dish, costed to the gram.

TechNext models each of Auntie Gaik Lean's dishes as a recipe in Odoo — so a plate of Curry Kapitan draws down its exact ingredients, and you always know what it truly costs to make.

Odoo Manufacturing

See a batch before you cook it

Plan a prep run and Odoo shows you, in real time, whether you have the ingredients, the capacity and the cost. It even suggests what to buy or make to fill any gap.

Production planning

Prep planned to the service

Schedule prep and sub-recipes against the kitchen's real capacity, and fine-tune the timeline on a simple drag-and-drop chart so everything is ready before the first table sits.

Prep schedule

Log prep on the line

A quick tap on a tablet or scanner. The kitchen records what it produced and used as it goes — fast, offline-friendly, and far fewer keying mistakes than a paper sheet.

Recording prep on a tablet
Prep worksheet Shop Floor view Quality check

A paperless kitchen line

One screen at each station. The Shop Floor view organises who's on, which station they're at, the prep worksheet and the quality checks — so the line runs off a tablet instead of a clipboard.

Consistency you can measure

Build taste, temperature and portion checks into the prep steps, and let the team flag waste as they spot it. Over time you can see exactly where quality slips — and fix it.

Quality analysis

Always improving

Continuous improvement

Built to cover the details.

Plan the week ahead

A master schedule lines up what the kitchen will produce with what the floor expects to sell.

Master schedule

Use every part

Capture by-products from a recipe — bones to stock, trim to sambal — instead of letting them go to waste.

Simple for the team

Powerful under the hood, but easy enough that the kitchen doesn't need heavy training to use it.

Full traceability

Track ingredients by batch or lot and trace every prep step in a click — good for food-safety confidence.

Connect your equipment

Link scales, label printers and probes so measurements and labels are captured automatically.

Connected to the rest

Recipes tie into stock and sales, so producing and selling a dish keeps ingredient levels honest.

Sales
Inventory
Project
PLM
Maintenance